Completion Time : 12 Hours

Brief : The Final Project required groups to design a multistoried buildings on the site provided by the Mentor. The permitted FAR was 5. A Mandatory clearance of 2M was to be maintained from all sides. The Permitted Ground coverage was 60%. The participants then had to carry out an environmental analysis using rhino, grasshopper and ladybug.